|
page 2 of 2 |
| back to page 1 |
|
3. CORNER ASSEMBLY
Hook female side of corner section into male side of panel then swing in the direction of arrow shown in
diagram.
4. ASSEMBLY OF LAST CORNER
(This step is for a four sided sukkah only.)
5. TOP REINFORCING WOOD BAR INSTALLATION On Sukkahs larger than 8ft. x 8ft. Special Top Brace "S" Clamp Brackets give the walls greater rigidity and stability. Slide wood bars into position as shown in the illustration.
5. TOP OF SUKKAH WOOD BEAM ASSEMBLY Place the pre-notched lumber beams on the top of the Sukkah as shown in the illustration. Now you can place the "schach" tree branches, bamboo mat, or bamboo poles on top.
FOR SUKKAHS WITH ONLY 3 WALLS Attach the (2) Wall Support Brackets to the wall with screws. This can be a permanent installation. Slide Sukkah panel into bracket as shown in illustration.
|
|
|
|
Home Canvas Sukkahs Quick Fit Sukkahs Modular Sukkahs Portable Sukkahs Schach Order Form Prices Shipping Instructions Learn About Contact Parts & Stuff Links Privacy |